After the system is designed and accepted, the equipment is ordered and pre-install preparations are started. Documentation drawings are produced and the equipment is ordered. After the equipment arrives, any necessary shop work is performed, such as pre-building the equipment racks and testing the equipment. It's finally time for the actual install. Depending on the complexity of the system, the installation could take a day or several months. Whatever the time, we strive to provide a safe installation for our crew and your building. Whether a new building or a retrofit, we also want to install a system that looks good and the cabling is numbered an well documented. |